Balkin Drive, Moore Creek image

Balkin Drive, Moore Creek

Ask about the plans behind this home:

 

Start the conversation

Somewhere to build memories

 

Jade and Wes built this as the family home, the one they plan to stay in until they retire and their daughter has moved out. They wanted a space where she could feel comfortable, have friends over, and where the family could get together. They came to Dunst with a plan they already had and no building experience. Cam went through it with them and pointed out things they hadn’t thought of, and the plan was tweaked based on his advice. Before anything was signed, the team spent a long time making sure they were happy with all of it, without pushing them. The build took about 26 weeks and finished on time, even with some rain delays. Her parents were building at the same time, and comparing the two houses, she could see the difference in the brickwork, tiling and painting.

 

The details

 

Built with the years ahead in mind. Cam looked past handover day and asked about later on, like whether they might want a pool one day. If so, the pipework could be planned for it now so nothing would need moving later. Smaller things got the same attention, down to whether the wardrobes should have two-track or three-track sliders. She said she felt supported and educated the whole way, even though she’d never built before.

 

 

In their words

 

"I can’t fault our experience. Things happened when they said they were going to happen." Jade, Moore Creek

 

Drawn from life, built with Dunst.

Start the conversation

 


The family name, building with Tamworth since 1960.